Fuling Shale Gas Field Holds Record For Longest Horizontal Well in China

Apr 23, 2024

On April 22, good news came from Sinopec Jianghan Oilfield. The Jiaoye 18-S12HF well in the Fuling shale gas field is operating normally after completing fracturing stimulation. This shale gas well once broke the two records of the longest horizontal section of my country's shale gas wells and the longest "one-pass drilling" footage of the horizontal section, marking that my country's shale gas horizontal wells have entered an ultra-long era.

24-4-23

From 1,007.9 meters in Jiaoye 1HF well to 4,286 meters in Jiaoye 18-S12HF, Zhang Yuqiang, deputy manager of Jianghan Oilfield Engineering Technology Management Department and Oil and Gas Production Capacity Construction Management Center, witnessed that the length of the horizontal section of shale gas wells continued to exceed the "upper limit" and maintained the domestic page The record for the longest horizontal well in rock and gas.

Zhang Yuqiang introduced that horizontal fracturing is the key to shale gas wells. In view of the difficulty in returning drilling cuttings in ultra-long horizontal sections and the tendency to get stuck and blocked, technicians optimized the pre-fluid, refined the well dredging, drilling and hole cleaning plans, and continued to strengthen cyclic sand discharge to ensure ultra-long drilling operations. The long horizontal section of the wellbore is clean and smooth, reducing friction.

During the drilling process, they controlled the drilling parameters in a targeted and real-time manner, successfully drilling the ultra-long horizontal section in one trip. In order to ensure that the casing can be pushed forward smoothly for more than 4,000 meters, technicians took measures such as optimizing the pipe string structure to achieve smooth casing removal.

At present, the center has developed innovative technologies such as key equipment and tool matching for ultra-long horizontal wells, friction and drag reduction for ultra-long horizontal wells, and dynamic optimization of drilling parameters for ultra-long horizontal wells to achieve "drilling fast, drilling accurately, and drilling well." ".

It is understood that since the Fuling shale gas field was put into development and construction, it has innovated the shale gas exploration and development theory, formed six core technologies, pioneered China's three-dimensional shale gas development technology, and the recovery rate of the three-dimensional development zone has reached the international advanced level. Up to now, the Fuling shale gas field has accumulated proven reserves of nearly 900 billion cubic meters, a cumulative built production capacity of 15 billion cubic meters, and a cumulative output of more than 47 billion cubic meters. It supplies more than 70 large and medium-sized cities in 6 provinces, 2 cities along the Yangtze River Economic Belt. Go to clean energy, benefiting thousands of companies and nearly 200 million residents.

You Might Also Like